Latest News 2019

The Mitchell Shire Transfer Station will soon be built to the South of our field, and outfitted with a shop for pre loved goods. The plan's are at the Seymour library if your interested in having a look 

The extension to the pit shade area is getting built at the moment, this will add an extra 8 x 4 mt just  needs extra fixing nuts and bolts, corner braces, and anti twist corner to corner straps fitted. Then it's ready for the roof.  

The Lipo battery charging station is also being built, as a safety measure all lipo battery's 

can be charged there

Move to the South

Welcome to

 

 

Mitchell Fixed Wing Aero Club

 

© 2023 mfwac inc. Created with Wix.com

updated 07-jun-18 12:05 s