Well the North/ South Strip has been Ripped and the top soil is coming on Tuesday,

Mike will then come with his Grader and Roller.

After he has done the grading he wants us to spread the grass seed and fertilizer, then he will roll it. 

North-South Runway Upgrade
June 2015

The top soil has now been spread ready for Mike to come with his Grader and Roller.

 

After he has done the grading he wants us to spread the grass seed and fertilizer, then he will roll it. 

North-South Runway Upgrade
July 2015

With 10mm of rain after the Grading, Seeding, Fertilizer and Rolling was completed.

 

Let the Grass grow

 

Big Thanks to Barry and Mike

 

North-South Runway Upgrade
10 June 2015

The Runway is looking great.

the Grass is growing.

North-South Runway UpDate 8 Aug 2015
f7.png
f7.png

f1.png
f1.png

f5.png
f5.png

f7.png
f7.png

1/6
DSCF2001.JPG
DSCF2001.JPG

DSCF2003.JPG
DSCF2003.JPG

DSCF2017.JPG
DSCF2017.JPG

DSCF2001.JPG
DSCF2001.JPG

1/13
IMAG0061.jpg
IMAG0061.jpg

To The South

IMAG0065.jpg
IMAG0065.jpg

To The SE

IMAG0070.jpg
IMAG0070.jpg

To The NW

IMAG0061.jpg
IMAG0061.jpg

To The South

1/6
IMG_1348.JPG
IMG_1348.JPG

IMG_1347.JPG
IMG_1347.JPG

IMG_1346.JPG
IMG_1346.JPG

IMG_1348.JPG
IMG_1348.JPG

1/3

Welcome to

 

 

Mitchell Fixed Wing Aero Club